I have added the final pulley and rigged the guidance TPFE tube up to that pulley and routed that to the general vicinity of the Archimedes pulley downgearing system. As seen in the photo, I used super glue and post it note paper to form a TPFE guidance tube support structure to hold it in place as well as wrapped it in fabric tape and soaked that tape in super glue. I applied the super glue with the tip of a sewing needle as a precision application method.
The next step will be to test the pulley system as is and make sure everything is working really well.
If all testing passes, we will then modify the Archimedes pulley system on the forearm that we were using before to simplify it some since it now deals with only 7" or so of string compared to 27" of string it dealt with when we did not have the turn in place pulley system in place. So it will now be much more compact and fewer pulleys needed in it. So a bit of redesign and part recycling and we’ll be good to go on that. Also, before, it was a 16:1 Archimedes pulley system whereas now it will just be a 8:1 system.